Pool Restoration Project

The featured image is from last summer Steve and Micah enjoying an afternoon in the pool.  For several years now, I have known our pool was in need of replastering.   2016 has become the year of replastering and rehabbing the pool.  Micah is the project manager under David Sage for Alliance Pools for the restoration.

The initial draining of the pool
The initial draining of the pool was started March 15 and was gradually done over 7 to 10 days to prevent unequal pressure between the pool and ground.

 

Pool drained and the beginning of the bad plaster removal.
Pool drained and the beginning of the bad plaster removal and tile restoration.   The hot tub is not completely drained yet.

April 28, 2016

The project continues as the tile is not as healthy as expected.   As of today April 28, 2016 35 to 40% of tile is off and we had tile shipped/trucked from Dallas to replace.
The project continues as the tile is not as healthy as expected. As of today April 28, 2016 35 to 40% of tile is off and we had tile shipped/trucked from Dallas to replace.
Micah inspecting and talking with David regarding pool steps.
Micah inspecting and talking with David regarding pool issues.
Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s